BIOLOGIC STEP STIFFNESS SIMULATION OF TANGENCY JOINTS ON SHEET PILE LOAD TRANSFER INTO WATERWAY BED
รหัสดีโอไอ
Title BIOLOGIC STEP STIFFNESS SIMULATION OF TANGENCY JOINTS ON SHEET PILE LOAD TRANSFER INTO WATERWAY BED
Creator Afshin Turk, PAKAVACH SAMANI, SHABNAM GHANAVATIZADEH, VAHID CHEGINI
Contributor -
Publisher ISEC PRESS
Publication Year 2560
Keyword AID, Connection, Persian Gulf, Bahmanshir River, thermal effects, Turk Joint
Abstract The Irrigation project of Abadan will supply fresh water through the three flat dams in the NW of the Persian Gulf. Circular cofferdam is located in the Bahmanshir River upstream in 2007. Cell dam and ship lock walls will be constructed using sheet piling and PPM Pipe-Pin-Micro piles on the steel walls. Next step is required to design ship lock concrete bed. It should have compatible behavior with the sheet walls, micro piles and Gelatin concrete. The main purpose is transferred the extra bending moment of waterway impact from the sheet walls into the concrete bed. It is mentioned that steel walls and concrete bed will operate individually without any connections with each other. Also, tangency joints will resolve the problems such as structural bed connection and steel wall thermal enlargement. In addition the bed and walls must perform independently. Artificial intelligence design
ISBN 978-0-9960437-4-8
International Struct Eng and Constructn Society

บรรณานุกรม

EndNote

APA

Chicago

MLA

ดิจิตอลไฟล์

Digital File
DOI Smart-Search
สวัสดีค่ะ ยินดีให้บริการสอบถาม และสืบค้นข้อมูลตัวระบุวัตถุดิจิทัล (ดีโอไอ) สำนักการวิจัยแห่งชาติ (วช.) ค่ะ