|
PRIORITIZATION OF PIPELINE REPLACEMENT BASED ON FAILURE RATE |
|---|---|
| รหัสดีโอไอ | |
| Title | PRIORITIZATION OF PIPELINE REPLACEMENT BASED ON FAILURE RATE |
| Creator | Amarjit Singh, Xi Song |
| Contributor | Didem Ozevin, Hossein Ataei, Mehdi Modares, Asli Pelin Gurgun, Siamak Yazdani, Amarjit Singh |
| Publisher | ISEC PRESS |
| Publication Year | 2562 |
| Keyword | Reliability, Bathtub curves, Water supply, Main breaks, Length in ground |
| Abstract | The purpose of this paper is to prioritize water pipelines for replacement through the analysis of pipeline failure rates and reliability. By using actual pipe condition record data from Honolulu Board of Water Supply (BWS), the constant failure rate is recognized through Bathtub profile and used to calculate reliability. This paper provides the utility manager a quantitative method to evaluate and arrange pipeline renewal. It assists in determining maintenance schedules depending on the age and type of the pipe by plotting the corresponding failure rate against time. Reliability helps determine whether the certain group of pipes are within the acceptable practice threshold to signal replacement. In this paper, the analysis of four major types of pipe systems from BWS are conducted. With the data from in fiscal year (FY) 2008, the failure rates are calculated, and the reliability of all pipelines are above 80%. |
| ISBN | 978-0-9960437-6-2 |
| Language | English |
| URL Website | https://www.isec-society.org/ |
| Website title | ISEC Society |