Heavylifting operations for the assembly of a 150 m long simply supported bridge deck |
|---|---|
| รหัสดีโอไอ | |
| Title | Heavylifting operations for the assembly of a 150 m long simply supported bridge deck |
| Creator | Juan J. Marti Gastaldo, Javier Martinez Gutierrez, Jose Luis Salamanca Garcia, Salvador Salamanca Garcia, Alvaro Delicado Grandal, Alvaro Saenz, Fernando Espinosa de los Monteros |
| Contributor | - |
| Publisher | ISEC PRESS |
| Publication Year | 2560 |
| Keyword | Lifting, Strand jack, SPMT, Load out, Removable deck, Construction equipment |
| Abstract | The new viaduct over the Cadiz Bay includes a removable deck to allow the navigation of large floating structures, higher than the 69 m clearance of the main cable-stayed span of the bridge. For this purpose, a 150 m long simply supported span was designed, which can be assembled and disassembled. The steel deck, weighing 4.000 metric tons, was completely manufactured onshore, the challenge being to move such a massive structure to its final position above the piers. It required for several heavylifting maneuvers, such us land transportation and load-out with two 6x28 axle lines of SPMT, sailing with a 100 m-long barge and positioning the deck in-between the piers with a tight gap, a lifting with eight strand jacks 850 T capacity each and a final transversal shifting. The aim of this paper being to describe all the activities and the heavylifting equipment employed for the assembly of such a massive deck. |
| ISBN | 978-0-9960437-4-8 |