EFFECT OF GROSS FLOOR AREA ON CONSTRUCTION TIME
รหัสดีโอไอ
Title EFFECT OF GROSS FLOOR AREA ON CONSTRUCTION TIME
Creator IFTE CHOUDHURY
Publisher ISEC Press
Publication Year 2557
Keyword Construction Time, Construction Cost, Construction Type, Gross Floor Area, Indian Construction Industry.
Abstract Studies indicate that there is a relationship between project cost and construction time for different construction markets. The purpose of this study was to validate the time-cost relationship model developed by Bromilow et al. (1980) in the context of commercial, residential, and industrial construction projects in India. The model was extended to include the magnitude of the projects in terms of gross floor area and construction types, todetermine whether these variables also have an effect on project duration. Data related to 99 construction projectsfrom all over India were obtained. The SPSSฉ program and the General Linear Model were used for analysis. Theresults show a statistically significant relationship between construction time and magnitude of the project, measured by gross floor area, at the level of significance (p-value) of < 0.0001. This variable, when introduced the model, presumably acts as a proxy for actual construction cost. Construction type did not have a statistically significant relationship with construction time. A prediction model of construction time has been developed based on the results of the study. This model will be useful to constructors who work at an international level.
ISBN 978-0-9960437-0-0
International Struct Eng and Constructn Society

บรรณานุกรม

EndNote

APA

Chicago

MLA

ดิจิตอลไฟล์

Digital File
DOI Smart-Search
สวัสดีค่ะ ยินดีให้บริการสอบถาม และสืบค้นข้อมูลตัวระบุวัตถุดิจิทัล (ดีโอไอ) สำนักการวิจัยแห่งชาติ (วช.) ค่ะ