<?xml version="1.0" encoding="UTF-8"?>
<xml><bibliography><APA>Paijit Pawan และ Thammasak Rujirayanyong. (2019) Contingency Estimation based on Risk Events of Tunnel Construction: Case study Nam Thuen 1 Hydropower Project. Rangsit University:ม.ป.ท.</APA><Chicago>Paijit Pawan และ Thammasak Rujirayanyong. 2019. Contingency Estimation based on Risk Events of Tunnel Construction: Case study Nam Thuen 1 Hydropower Project. ม.ป.ท.:Rangsit University;</Chicago><MLA>Paijit Pawan และ Thammasak Rujirayanyong.  Contingency Estimation based on Risk Events of Tunnel Construction: Case study Nam Thuen 1 Hydropower Project.  ม.ป.ท.:Rangsit University, 2019. Print.</MLA></bibliography></xml>
